Operation flow of combustion engine
time:2021-12-17 views: 1127 author : GACO

   Check whether the boiler (thermal energy equipment) operates? Whether there is satisfactory medium in the thermal energy equipment and heating system? Whether the flue gas discharge channel is smooth? Whether there is an explosion-proof door? If there is a flap on the flue gas discharge channel, whether it is completely opened? Whether the on-site air channel is smooth? Whether the water (oil) shortage alarm device is adjusted correctly and can operate normally? Whether the operation regulations of thermal energy equipment (steam boiler) are satisfactory? The fuel delivery pipeline shall be purged and cleaned and the air shall be discharged.

   Check whether the voltage connecting the power supply line of the burner is consistent with the standard of the burner, and whether the power connection between the power supply line and the motor is consistent with the power supply voltage. Check whether all electrical connections on site are correctly implemented according to the instructions in the circuit diagram, verify that all air supply pressures are consistent with the nameplate requirements on the gas valve, and check that the gas supply pipeline has been correctly connected without leakage. Verify that the burner itself has operating conditions.

   After closing the main power switch, open all ball valves outside the burner. If the thermostat has been closed, the power is sent to the controller through the gas pressure switch. If the operating conditions are met, start the operation. After that, the fan motor is connected and purged in front of the combustion chamber. At this time, the combustion supporting air damper, gas pipeline valve and return air damper return to the direction of low fire flame for incineration. Then, the gas valve (main valve and safety valve) is opened and the burner is incinerated. After ignition, enter the manual operation mode to regulate and control the high and low fire.


Consultation hotline
  • Landline:0531-83659330
  • Fax:0531-83382689
  • Email:admin@gacoch.com
  • Headquarters address: No. 9 Ningshi Road, Zhangqiu District, Jinan City, Shandong Province
News
GACO  Equipment Joins Hands with State Power Investment to Build Green New Energy
GACO Equipment Joins Hands with State Power Investment to Build Green New Energy

State Power Investment Group Co., Ltd. (referred to as "State Power Investment") is a super large st···

+MORE
102024-01
GACO Joins Hands with Black Cat Group to Build a Smokeless Factory
GACO Joins Hands with Black Cat Group to Build a Smokeless Factory

The coal chemical industry has a wide variety of products, a large economic output, and a wide coverage area, ···

+MORE
052023-09
Tel
0531-83659330
WeChat
WeChat
Message
Top
GACO (Shandong) Intelligent Equipment Co., Ltd. Record n varchar:鲁ICP备17025986号-5
Home
Product
consult
use
serve