During the operation of the drying hot blast stove, some dirt will form more or less due to the magazine in the water. When there are too many impurities, the drying hot blast stove will fail. Therefore, we need to carry out blowdown in daily maintenance. What should we pay attention to in blowdown operation?

As for the drying hot blast stove, before the implementation of blowdown operation, the first point is that the water level in the drying hot blast stove should be adjusted to a level slightly higher than the normal water level. There should be no flowing sound in the blowdown pipe. It is necessary to touch the blowdown pipe outside the blowdown valve by hand. If the sensing temperature is relatively high, it indicates that the blowdown valve is leaking, At this time, it is necessary to check in time, find out the causes, and then deal with them.
The blowdown operation of the drying hot blast stove itself requires regular and uniform blowdown. At least one blowdown is required for each shift. There will be multiple blowdown pipes on a hot blast stove. It is necessary to blowdown each blowdown pipe in turns. It is assumed that only part of the blowdown pipes will be blowdown.
However, if the other part does not discharge sewage, it will lead to the blockage of some sewage pipes, so the water circulation will be damaged. If it is serious, it will also lead to pipe explosion. However, when several drying hot blast stoves use the same blowdown main pipe together, when there is no check valve on the blowdown pipe of each hot blast stove, in this case, it is forbidden to blowdown together. In order to discharge the sewage back, it enters next to other hot blast stoves.
近日,加科燃烧器圆满完成江苏君乐宝乳业有限公司2台低氮燃烧器项目的安装与调试工作,为乳业生产的高效、环保运行注入···
近日,加科燃烧器顺利完成对青海云天化国际化肥有限公司2台25吨低氮燃烧器的改造项目,标志着双方在环保与能源效率提升···